- 9Rittal VX25 sections in the MCC
- 7.2 mMCC front length
- 4SINAMICS G120X drive panels, 500 kW and 3 × 315 kW
- 40 MWtwater-tube boiler
Motor control centre
The MCC distributes power at 400 V. It was built in modular Rittal VX25 enclosures with Schneider Electric protection and switching devices:
- Main protection with a ComPacT NSX 400 A circuit breaker
- Direct-on-line starters with TeSys devices for motor protection and switching
- Siemens SINAMICS G120C drives for the lower-power applications
Drive panels for the large motors
The four highest-power drives of the boiler have their own panels, separate from the MCC, with Siemens SINAMICS G120X drives for 400 V three-phase motors:
- Induced draught fan, 500 kW
- Combustion air fan, 315 kW
- Two boiler feedwater pumps, 315 kW each
MIESA engineered and built the panels and integrated the drives with their auxiliary components.
Control panels
- Main control panel: Siemens SIMATIC ET 200SP CPU and I/O, with digital and analogue inputs and outputs, power supplies and signal connections, communicating over PROFINET
- Pump control panel: local/remote control, start and stop, and running status indication
- Drum level panel: GESTRA level monitoring and limiting equipment, with its relays and auxiliary components
MIESA carried out the electrical integration of this equipment. Control programming was not part of its scope.
Manufacturing, testing and shipment
The panels were built in MIESA’s workshop in the first quarter of 2024, with manufacturing progress reports. The factory acceptance tests (FAT) were carried out in the workshop in April 2024, after which the equipment was prepared for transport to French Guiana. The final as-built documentation, with functional diagrams, general arrangement and bill of materials, was updated in February 2025.
The project in pictures






Other MIESA projects with Berkes
In 2009 we implemented the Siemens PCS 7 control system of the 8 MW biomass power plant in Villacañas (Toledo, Spain).
Do you need an MCC or drive panels for your plant?
We build motor control centres and power and control panels in our own workshop, with FAT before shipment.