3MVA power generation plant, fire detection and suppression system for excellence hotel in Cancun (Mexico, 2006)
Scope
Electrical supply and installation of low voltage (LV main switchboard) and medium voltage (transformer substation with Schneider cells) systems. Supply and installation of control system and of electric generators control and power panel (Schneider PLC control panel). Fire detection and suppression control system programming. Start-up.