We developed the complete programming of the plant, from process control to the supervisory interface, using Mitsubishi Electric technology. The plant generates electricity from biomass (wood pellets and palm kernel shells, PKS) and needed a reliable, flexible and safe automation system.
The challenge
- Redundant control and operational continuity in materials handling
- Separate management of biofuels with traceability
- Risk prevention through dust extraction
- Centralised, visually accessible control
The solution
Loading process
- Four truck unloading stations
- Conveying to eight silos with belts and elevators
- Silo allocation for pellets and PKS
- Redundant routes between stations and silos
Discharge process
- Transfer to the three boiler feed silos
- Gravity discharge or mechanical conveying
Our automation scope
- Complete development of the control logic
- PLC programming
- Design of the supervisory HMI screens
- Configuration of the variable frequency drives
- Commissioning of the programming on site
Mitsubishi Electric technology applied
GX Works3
Programming of the Mitsubishi Electric PLCs that control fuel reception, conveying, silo allocation and discharge.
GT Designer3
Development of the HMI screens for centralised, real-time supervision of the plant.
FR Configurator2
Configuration of the variable speed drives for belts, elevators and conveying equipment.
Outcome
- Programming tailored to the client’s operational needs
- Clear, real-time supervision through the HMI
- Separate handling of pellets and PKS with traceability