Assembly of Dow Chemical 24KW substation. Leioa, Bizkaia
Scope
1. Automation of latex plant. Assembly, calibration and start-up.
2. Assembly of Wax computing system and connection of all terminals.
3. Electrical installation at expansion of COYDEN.
4. Instrumentation installation of new steam boilers.
5. Assembly of plants manufacturing
a. STYROFOAM
b. LATEX
c. POLYSTYRENE
6. Automation of reactors, unit load, product storage with a redundant system and Modicon Modbus Plus communication protocol.
7. Automation of Dow Chemical plant. Ribaforada, Navarra (Spain)
8. Styrofoam revamping project.
2. Assembly of Wax computing system and connection of all terminals.
3. Electrical installation at expansion of COYDEN.
4. Instrumentation installation of new steam boilers.
5. Assembly of plants manufacturing
a. STYROFOAM
b. LATEX
c. POLYSTYRENE
6. Automation of reactors, unit load, product storage with a redundant system and Modicon Modbus Plus communication protocol.
7. Automation of Dow Chemical plant. Ribaforada, Navarra (Spain)
8. Styrofoam revamping project.