Energy, refining and petrochemicals

Crude oil pumping station in the Caribbean – Migration of the control system and MCC

Client
NATIONAL CRUDE OIL OPERATOR
Year
2019
Area
Engineering, automation and revamping
Subsector
OIL & GAS

Scope

Complete migration of the control system and crude oil pumping MCC of a pipeline in the Caribbean: from a system more than 17 years old with SMAR controllers and Foundation Fieldbus to a redundant Siemens PCS 7 DCS, with new drives and an Emergency Shutdown System.

Grupo Miesa carried out the complete migration of the control system and the MCC responsible for crude oil pumping on a strategic pipeline in the Caribbean. The original system, in operation for more than 17 years, consisted of variable frequency drives, SMAR controllers and a Foundation Fieldbus (FF) instrumentation network.

  • 17+years in service of the system replaced
  • S7-400Hredundant controllers
  • 315 kWlargest drive (plus 11 and 132 kW)
  • 10 kWUPS in the control room

Field instrumentation

The existing Foundation Fieldbus instrumentation was reused and new ATEX-compliant equipment was added. In the classified areas, ET 200iSP remote I/O and SIMATIC Compact Field Units (CFU) were used, connecting the field devices through digital protocols.

Control and supervision system

  • Siemens PCS 7 DCS with an engineering station and an operator station
  • Redundant S7-400H controllers for harsh environmental conditions (IEC 60068-2)
  • Redundant fibre-optic ring network with Media Redundancy Protocol (MRP)
  • SIPLUS equipment in control and communications wherever possible, due to the aggressive environment: sulphur, salinity, humidity and high temperatures
  • Direct integration with drives, the MCC and intelligent field devices

Drives, safety and control room

  • Replacement of the variable frequency drives with new 11 kW, 132 kW and 315 kW units
  • Emergency Shutdown System (ESD) to IEC 61508, with shutdown logic and dedicated safety elements; safety logic integrated in the DCS to SIL 2/3 (IEC 61511)
  • Complete refurbishment of the control room: lighting, air conditioning, technical furniture and a 10 kW UPS

Result

An obsolete system has been transformed into a modern, scalable platform, with redundancy in controllers, networks and stations, real-time monitoring of pump vibration, temperatures and efficiency, and operator stations with a clear, standardised interface. Miesa was responsible for detailed engineering, programming and commissioning in an environment with demanding safety requirements (ATEX, SIL).

  • Siemens PCS 7
  • S7-400H
  • ET 200iSP
  • SIMATIC CFU
  • Foundation Fieldbus
  • SIPLUS
  • MRP
  • IEC 61508
  • IEC 61511
  • Revamping