Selecciona el idioma:
  • Español
  • English

Auxiliary 25 t/h boiler for Riga TEC-II combined cycle thermal power station (Latvia, 2011)

Auxiliary 25 t/h boiler for Riga TEC-II combined cycle thermal power station (Latvia, 2011)


Scope

Electrical supply (Siemens MCC); control system (Siemens PLC control panel) supply and installation. Control system programming. Start-up.

Client

LOINTEK

Date

2011

Area

Engineering

Sector

Industry & Power

Subsector

COMBINED CYCLE POWER STATIONS