Energy, refining and petrochemicals
Auxiliary 25 t/h boiler, thermal power station, Santurtzi, Bizkaia (Spain, 2003)
- Client
- IBERDROLA
- Year
- 2003
- Area
- Engineering
- Subsector
- COMBINED CYCLE POWER STATIONS
Scope
Control system (Siemens PLC control panel) supply and installation. Control system programming. Supply of materials for the instrumentation and electrical installation. Start-up.
Have a project in mind?
Tell us what you need and we will put you in touch with the right team.






