Chemicals and process industry
Installation of a 24 kV substation for Dow Chemical, Leioa, Bizkaia (Spain, 2004)
- Client
- DOW CHEMICAL IBÉRICA S.A.
- Year
- 2004
- Area
- Installation
- Subsector
- CHEMICAL PLANTS
Scope
1. Automation of the latex plant: installation, calibration and start-up.
2. Installation of the WAX computer system and connection of all terminals.
3. Electrical installation for the COYDEN expansion.
4. Instrumentation installation of new steam boilers.
5. Assembly of plants manufacturing
a. STYROFOAM
b. LATEX
c. POLYSTYRENE
6. Automation of reactors, unit load, product storage with a redundant system and Modicon Modbus Plus communication protocol.
7. Automation of Dow Chemical plant. Ribaforada, Navarra (Spain)
8. Styrofoam revamping project.
Have a project in mind?
Tell us what you need and we will put you in touch with the right team.



