Energy, refining and petrochemicals

Mori-No-Miyako biomass plant (Japan)

Client
Mori-No-Miyako plant
Year
2025
Area
Engineering
Subsector
BIOMASS PLANTS

Scope

Complete programming of PLCs, HMI and drives (Mitsubishi Electric) for a power plant that generates electricity from wood pellets and palm kernel shells (PKS).

The challenge

  • Redundant control and operational continuity in materials handling
  • Separate management of biofuels with traceability
  • Risk prevention through dust extraction
  • Centralised, visually accessible control

The solution

Loading process

  • Four truck unloading stations
  • Conveying to eight silos with belts and elevators
  • Silo allocation for pellets and PKS
  • Redundant routes between stations and silos

Discharge process

  • Transfer to the three boiler feed silos
  • Gravity discharge or mechanical conveying
  • GX Works3
  • GT Designer3
  • FR Configurator2