Manufacturing and materials

Elytt Energy – Three Siemens PCS 7 control systems for VPI impregnation

Client
ELYTT ENERGY · NEUREUS
Year
2013-2015
Area
Automation
Subsector
ANCILLARY INDUSTRY
Specialties
Industrial automation, Basic and detailed engineering
Technology
Siemens PCS 7

Scope

Three identical control systems with Siemens PCS 7 V8.0 SP2 for vacuum pressure impregnation (VPI) plants, each with a CPU 414-3 PN/DP controller and ten ET 200SP stations with temperature measurement.

  • 3identical PCS 7 systems
  • 2013–2015years of delivery
  • 43RTD/TC temperature modules per system
  • V8.0 SP2Siemens PCS 7 version

Between 2013 and 2015 we delivered three identical Siemens PCS 7 control systems for Elytt Energy and Neureus, each for a VPI plant. In vacuum pressure impregnation, the part is impregnated with resin in an autoclave, first under vacuum and then under pressure, to remove the air and fill every void in the insulation.

Control architecture of each system

  • CPU 414-3 PN/DP controller
  • Ten ET 200SP stations with digital inputs and outputs, analogue inputs and 43 temperature modules (RTD/thermocouple)
  • Operator station (OS Single Station) with web server
  • Siemens PCS 7 V8.0
  • CPU 414-3
  • ET 200SP
  • Temperature measurement
  • VPI
  • Vacuum pressure impregnation

← All projects

Have a project in mind?

Tell us what you need and we will put you in touch with the right team.